New Crusader Student Center

Concrete has been poured on the steel deck on the entire upper level, and a portion of the lower level.

Exterior Steel Stud Framing begins!

Roof sheathing and wood framing package is delivered!

The main entryway structural steel frame is near completion.

Remaining lower level is prepared for concrete to be poured!

First opportunity to begin to visualize the Student Center dining and kitchen area!

August 11 - 16, 2008