Concrete has been poured on the lower level and both entryways, exterior steel stud framing is near completion and some interior framing has begun! Roof trusses are delivered for the main entry. Roof sheathing is installed on the main building! The Student Center dining area ceiling and stage area are being framed! Lobby ceiling and office area floor is being framed and sheathed. Fire sprinkler system is being installed. Copper piping is being installed in the lower level . . . IT'S A BUSY PLACE!
August 18 - 27, 2008